Rasco had successfully implemented the following projects in Caspian region

Project Client Asset Year

Combined Direct Current Voltage Gradient and Close interval Potential Survey of CP systems, for 900km of major transmission pipelines, including stations and inline facilities..

BP AzSPU BTC/SCP Pipelines Azerbaijan 2009 - 2010

Combined Direct Current Voltage Gradient and Close interval Potential Survey of CP systems, for 500km of major transmission pipelines, including stations and inline facilities..

BP AzSPU BTC/SCP Pipelines Georgia 2009 - 2010

Routine monitoring, maintenance and audit of Impressed Current CP systems, for 900km of major transmission pipelines, including stations and inline facilities.

BP AzSPU BTC/SCP Pipelines Azerbaijan 2009

Routine monitoring, maintenance and audit of Impressed Current CP systems, 500km for major transmission pipelines, including stations and inline facilities.

BP AzSPU BTC/SCP Pipelines Georgia 2009

Routine monitoring, maintenance and audit of Impressed Current CP systems, for 450km of major transmission pipeline, including stations and inline facilities.

BP AzSPU WREP Pipelines Azerbaijan Since 2006

Routine monitoring, maintenance and audit of Impressed Current CP systems, for 250km of major transmission pipeline, including stations and inline facilities.

BP AzSPU WREP Pipelines Azerbaijan Since 2006

Routine monitoring, maintenance and audit of Impressed Current CP systems for major oil and gas terminal.

BP AzSPU Sangachal Terminal Facility; Azerbaijan Since 2006

Design, Supply, Install and commissioning of sacrificial anode CP system for BP Diesel Tank Farm and quayside buried import/ export lines

BP AzSPU BP Diesel Tank Farm; Azerbaijan 2009

Design, Install and commissioning of CP integrated impressed current CP system for Sangachal Onshore Terminal

BP AzSPU Sangachal Terminal Facility; Azerbaijan 2009 - 2010

Design, Supply, Install and commissioning of sacrificial anode CP system for 8" NICO pipeline between Sangachal Garadag Terminal operated by Corsscaspian and Sangachal Terminal

Crosscaspian Sangachal Garadag Terminal; Azerbaijan 2009 - 2010

Design, Supply, Install and commissioning of sacrificial anode CP system for 8" NICO pipeline between Sangachal Garadag Terminal operated by Corsscaspian and Sangachal Terminal

Encotec Sangachal Terminal Facility; Azerbaijan 2009

Design, install and commisioining of CP  integrated impressed current CP system for Sangachal Onshore terminal 

 BP Sangachal Terminal Facility; Azerbaijan 2009-2011

Monitoring, testing, maintenance and survey services for onshore and offshore pipelines, pipeline intermediate facilities, onshore terminals, stations and offshore jackets. The onshore pipeleines included  BTC,SCP, WREP pipelines in Azerbaijan and Georgia. 

BP BTC / SCP Pipeleines Azerbaijan, Georgia. WREP Pipeleine Azerbaijan, Georgia, Sangachal Terminal Facility,  2009-2012

The above Onshore Pipeline and Facilities comprise of: • Sangachal Terminal • BTC Oil export Pipeline and facilities • SCP Gas Export Pipeline and facilities • WREP – Western Route Export Pipeline and facilities including SUPSA and the Onshore / Offshore Export Pipeline

BP BTC / SCP Pipeleines Azerbaijan, Georgia. WREP Pipeleine Azerbaijan, Georgia, Sangachal Terminal Facility,  2009-2012

Design of CP system for Sangachal Garadagh Terminal 

SQT SQT  Oil Terminal ; Azerbaijan 2013

Material supply and installation of CP system for Sangachal Garadagh Terminal  storage tanks 

SQT SQT  Oil Terminal ; Azerbaijan 2014

Material supply and installation of CP system for Ships

Techmarine  Azerbaijan 2015-present